| US 7,461,461 B2 | ||
| Kwik leads | ||
| Stephen E. Howell, 1919 Ashemere Dr., Iron Station, N.C. 28080 (US) | ||
| Filed on Sep. 25, 2006, as Appl. No. 11/526,333. | ||
| Application 11/526333 is a continuation in part of application No. 11/088624, filed on Mar. 24, 2005, abandoned. | ||
| Claims priority of provisional application 60/556791, filed on Mar. 29, 2004. | ||
| Prior Publication US 2007/0017107 A1, Jan. 25, 2007 | ||
| Int. Cl. G01C 15/10 (2006.01) | ||
| U.S. Cl. 33—404 [33/407] | 4 Claims |

| 1. A guide tool for the laying of brick during formation of a vertical wall upon a structure, comprising:
an elongated first member for placing against the face of bricks in a wall wherein said member is substantially rectangular
and has substantially planar inner and outer surfaces, wherein said first member is provided with a scale with measurements
stamped or etched thereon at various desired locations,
a second member for contacting bricks attached to said first member at a right angle thereto, wherein said second member is
substantially rectangular and has substantially planar inner and outer surfaces, wherein said second member is provided with
an elongated slot in its longitudinal direction,
means for adjusting the distance the second member extends beyond said first member, wherein said adjusting means comprises
an adjusting screw extending through said slot in said second member into said first member,
means for fixing the relationship of said second member to said first member; and
a handle attached to said first member.
|